Digester Heating Project

In 2014 CAWD replaced the existing Digestion System Heating System which was originally installed in the 1970’s with a new more energy efficient boiler system and new heat loop piping.
In 2014 CAWD replaced the existing Digestion System Heating System which was originally installed in the 1970’s with a new more energy efficient boiler system and new heat loop piping.